579 328 023

Coat Hook and Hanger Installation in Warsaw — Hallway, Bathroom, Kitchen

A hook or hanger seems trivial, but without them the hallway becomes a pile of jackets and bathroom towels end up on the washing machine. Looks simple — drive two screws. In reality: a hook in plasterboard rips out with the first coat, tile cracks when you drill it wrong, and a wall plug in concrete spins because the diameter is off. In flats across Wola, Mokotow and Praga we install hooks and hangers every day — we know how to fix them to any wall.

How much does hook installation cost

The price depends on the number of fixing points and wall type. One hook on concrete is a one-minute job. A five-hook rail on tiles is trickier — you need to drill through ceramic without cracking it. Standard fixings are included in the price. Current rates in the table below.

Serviceminmax
Coat hanger installation 60 zł120 zł
Shelf installation 80 zł150 zł

What we install

How installation works

  1. We identify the wall type: concrete, brick, plasterboard, tiles.
  2. We choose fixings: standard plugs for concrete, toggle bolts for plasterboard, tile drill bits for ceramics.
  3. We mark fixing points with a level. Even a single hook goes on straight.
  4. We drill. On tiles — first a spade bit with no hammer action, then switch to a masonry bit.
  5. We insert plugs and screw in the hanger or hooks.
  6. We test — hang a heavy coat, give it a pull. It must hold firm with no wobble.

Common mistakes

What to prepare

A real case from Warsaw

A family in Ursynow moved into a new-build — bare walls, not a single hook. They needed: a seven-hook rail in the hallway (concrete), three towel hooks in the bathroom (tiles) and two hooks in the kitchen (plasterboard). Hallway — standard 8 mm plugs. In the bathroom the technician drilled the tiles with a spade bit on no-hammer setting, then concrete with a hammer drill. Not a single tile cracked. Kitchen — toggle bolts. The whole job took 40 minutes.

Frequently asked questions

Are fixings included?

Standard fixings — yes. Specialist ones (toggle bolts, chemical anchors) — charged separately.

Can you install on tiles?

Yes. We drill with a specialist bit on no-hammer setting. If the tile is old or thin we will warn you of the risks first.

What about plasterboard?

Toggle bolts or molly bolts. Heavy hangers go into the metal stud frame.

How many hooks per visit?

Usually 5-15. A full set for the entire flat can be done in one visit.

Do you work weekends?

Yes, Saturdays and Sundays are regular working days.

Who does the work

Installation is handled by technicians experienced with all wall types — concrete, brick, plasterboard, tiles. We cover all of Warsaw: Mokotow, Wola, Ursynow, Praga, Bemowo, Ochota. Call or message to book.