579 328 023

Shower Cabin Installation in Warsaw — Assembly and Plumbing Connection

The shower cabin has been delivered, it is sitting in boxes — and then it turns out that putting it together is not as simple as expected. The tray has to be perfectly level, the drain trap connected to the waste pipe at the right angle, the panels fixed plumb, and every joint sealed. In flats around Praga Poludnie and new developments in Wilanow the issues are the same: uneven floors, short pipe runs, tight bathrooms. We handle shower cabin installation from unboxing to leak testing.

How much does installation cost

The price depends on the cabin type (corner, wall-mounted, high or low tray), the complexity of the plumbing connection and the condition of the bathroom. If the water supply needs extending or the waste outlet needs relocating, the cost goes up. Current rates for all bathroom work are in the table below. Fixings and sanitary silicone are included; the cabin itself and any plumbing materials are supplied by the client.

Serviceminmax
Washbasin installation 200 zł300 zł
Washbasin replacement 150 zł250 zł
Vanity unit with basin installation 250 zł450 zł
Basin mixer tap installation 150 zł250 zł
Basin mixer tap replacement 180 zł300 zł
Floor-standing toilet installation 200 zł350 zł
Floor-standing toilet replacement 250 zł400 zł
Wall-hung toilet installation (frame) 350 zł600 zł
Toilet frame replacement 600 zł1200 zł
Bathtub installation 700 zł1000 zł
Bathtub replacement 900 zł1400 zł
Shower cabin installation 900 zł1200 zł
Shower tray installation 500 zł800 zł
Shower tray replacement 600 zł1000 zł
Linear drain installation 800 zł1500 zł
Shower cabin / bathtub sealing 35 zł/mb60 zł/mb
Towel radiator installation 250 zł450 zł
Towel radiator replacement 350 zł700 zł
Drain cleaning 150 zł300 zł
Trap replacement 120 zł220 zł

How the installation works

  1. Bathroom inspection: we check the waste outlet position, pipe diameter and access to the riser. We measure the space for the cabin.
  2. Unpacking and inventory check: we compare parts against the instruction sheet and inspect glass panels and profiles for damage. If anything is missing it is better to know before assembly starts.
  3. Tray installation: we level it using adjustable feet, connect the drain trap to the waste pipe and check the fall — water must drain quickly with no pooling.
  4. Frame and rail assembly: aluminium profiles are fixed to the walls and aligned vertically and horizontally. We drill tiles carefully — with a tile bit, no hammer action.
  5. Glass panels and door fitting: panels are hung on rollers and the door travel is adjusted so they slide smoothly and close without gaps.
  6. Sealing: sanitary silicone is applied to every joint between the profiles, the wall and the tray. We use mould-resistant silicone only.
  7. Final test: we turn on the water, check every joint for leaks and run the drain under load. The client inspects the result before we leave.

The whole installation takes between two and four hours depending on the cabin design and the state of the plumbing.

Common installation mistakes

What to prepare before the visit

A real case from Warsaw

We were called to a flat in Praga Poludnie. The owners had bought a 90 x 90 cm corner cabin with a high tray. The bathroom was small and the waste outlet was 15 cm away from where it needed to be. We extended the pipe with a flexible connector and fitted a trap with a side outlet to maintain the correct fall. The tray was levelled on its feet, connected and tested — water drained fast. We assembled the frame, hung the glass panels and adjusted the doors. Silicone was applied around the full perimeter. Water on — completely dry, not a single leak. The job took three hours. The owners have been using it for six months with no complaints.

Frequently asked questions

Can I install the cabin myself?
Technically yes, but there are pitfalls: the tray must be perfectly level, the trap connected correctly and every joint sealed. A mistake at any stage leads to leaks. If you have no experience it is safer to call a professional.

How long does installation take?
Two to four hours on average. It depends on the cabin type and the state of the plumbing. A cabin with hydromassage or a steam generator takes longer.

Do I need to remove the old cabin first?
Yes, and that is a separate job. We can do the removal during the same visit, but please let us know in advance.

What if the waste outlet does not line up with the drain?
We extend the pipe using a flexible connector or rigid elbows. The key is to maintain the fall for proper drainage. If the distance is large the outlet may need to be relocated — that counts as plumbing work.

Which sealant should be used?
Sanitary silicone with anti-mould additives only. Standard acrylic or universal silicone grows mould quickly in a wet environment.

Cabin with a tray or without — which is better?
A tray cabin is easier to install and cheaper. A walk-in (trayless) setup requires floor waterproofing and a linear drain — a different level of work and budget. For a standard bathroom we recommend a cabin with a tray.

Book the installation

We install shower cabins across Warsaw — arriving with tools, fixings and sanitary silicone. We work carefully: tiles drilled without chipping, every joint checked for leaks. Get in touch and we will arrange a convenient time.