A pane is cracked, the hardware has failed, cold air is coming in from under the frame, or you have simply decided to replace the glazing — and now you need it installed. At first glance it seems easy: remove the old window, put the new one in place, foam around it. But if the measurements are off, the frame is set crooked, or the foam joint is done carelessly, in six months you can end up with gaps, condensation and draughts. We fit uPVC and timber windows all over Warsaw: standard, roof, and non-standard sizes. If the old window is still in decent condition but lets air through, adjustment or resealing may solve it without a full replacement.

The price is shaped by the window dimensions, the type of construction, and the state of the reveal. A standard two-leaf window in a panel block is one case. A large floor-to-ceiling balcony unit is another. A roof window in a pitched roof is a third, and the fixing method there is completely different.
The labour price includes removing the old window (if there is one), installing the new one, levelling it, anchoring it, foaming the perimeter gap, and checking how it opens. The window itself is supplied by the client. A sill, reveals, and external flashing are priced separately. Waste disposal is extra. Current prices below (compatible with Porta, VOX, Erkado and similar).
| Service | min | max |
|---|---|---|
| Window installation | 300 zł | 700 zł |
| Window adjustment | 30 zł | 60 zł |
| Window sealing | 25 zł/mb | 40 zł/mb |
| Window repair | 150 zł | 400 zł |
Send a photo of the window along with the reveal dimensions — the technician will work out the exact price.

Installing a window is more than just placing it in the opening and filling the gap with foam. Each stage matters for airtightness, heat retention, and how long the unit will last. This is how the technician does the job:

Errors during window installation are costly. Fixing a bad installation is harder and more expensive than doing it properly from the start:

Window installation makes a lot of dust — a bit of preparation saves both time and hassle:

A client in Praga-Poludnie chose to replace three windows in a flat from the 1970s. The old timber frames had dried out, the seals had crumbled to dust, and the draughts were strong enough to shift the curtains. The reveals turned out to be uneven — up to 15 mm difference in width between the top and the bottom.
We first had to level the reveals with cement mortar and leave them for a day. On day two we installed all three windows: two standard double-leaf units and one balcony door-and-window set. Each frame was set with a laser level and anchored every 50 cm — the reveals were old, and the silicate brick walls crumble easily. We used professional winter-grade foam (it was +3 °C outside) and applied tapes inside and outside. The sills were fitted with the right slope, and the external flashings were sealed. The sashes were adjusted — all of them now close smoothly. The client felt the difference straight away: the flat became quiet and warm. The conclusion is simple: in older Warsaw buildings window installation takes more time because the reveals are uneven, but the end result is worth waiting for.
Yes, down to -10 °C. We use winter-grade expanding foam that sets in low temperatures. The opening stays exposed for 30–60 minutes — the flat does not lose heat to a critical level.
A standard window — 2–3 hours including removal of the old one. Without removal (new build) — 1.5–2 hours. A balcony door set — 3–4 hours.
Best done within a week. Exposed foam breaks down under UV. At minimum, cover the joint on the outside with tape.
uPVC is less expensive and needs no maintenance. Timber looks better and allows more breathability, but it needs repainting every 5–7 years. Thermal performance is about the same for comparable profiles.
No, the client orders the window. We can assist with measurements and advise on choosing the profile and glazing unit.
Included: removal of the old window, fitting the new one, foaming, hardware adjustment. Not included: the window itself, sill, reveals, external flashing, waste removal.

Your windows are fitted by tradespeople with hands-on experience in panel blocks, brick-built period buildings, and new developments across Warsaw. We work with uPVC and timber units in all sizes. We come fully equipped: rotary hammer, laser level, expanding foam, anchors, tapes. After fitting, the window will be airtight, the sashes will move smoothly, and the perimeter joint will be protected against moisture and UV. If you notice a draught caused by our installation, we will fix it free of charge. Call or message us — we usually reply within an hour.