www.handyman24.eu/en · EN

Laminate Flooring Installation in Warsaw — Level Floors, No Surprises

Warszawa · 24.02.2026 · ≈ 7 min read

You bought the panels, carried them upstairs, looked at the floor — and it turns out it is not flat? Or maybe it looked alright, but once installed the boards start creaking, clicking at the joints, and opening up after a couple of months? That is the usual outcome when laminate goes down without proper prep. We fit laminate flooring all over Warsaw — in new builds and older flats, in houses and offices. We come with our own tools, inspect the subfloor, and install everything with the right expansion gaps and proper method. If you want a floor that stays even and problem-free for years, give us a call.

How much does laminate installation cost and what affects the price

The cost depends on the area, the state of the subfloor, and the panel type. Standard click-lock laminate is charged at one rate; glue-down vinyl planks at another. If the floor is uneven and needs prep work (levelling, priming), that increases the final amount. Removal of old flooring, skirting boards, and thresholds is charged separately. Underlay and the laminate itself are provided by the client — we install what you already have or advise what to purchase. Current prices are in the table below.

Service min max
Floor panel removal 15 zł/m² 25 zł/m²
Floor panel installation 70 zł/m² 90 zł/m²
Floor panel replacement 70 zł/m² 100 zł/m²
Vinyl panel installation 80 zł/m² 120 zł/m²
Baseboard installation 30 zł/mb 45 zł/mb
Baseboard removal 15 zł/mb 25 zł/mb
Old flooring removal 12 zł/m² 20 zł/m²
PVC flooring installation 45 zł/m² 75 zł/m²
Glue-down flooring installation 45 zł/m² 75 zł/m²
Floor threshold installation 180 zł 300 zł
Door trimming after floor installation 120 zł 250 zł

How the on-site installation works

  1. You send a photo of the room and the approximate area — the technician assesses the scope and gives you an estimated cost.
  2. On site we inspect the subfloor: level, moisture, and condition of the screed. If there are dips greater than 2 mm per metre, we tell you immediately — levelling is required.
  3. We remove the old flooring if needed: linoleum, carpet, old laminate. Skirting boards are removed carefully — if they are in good condition, we reinstall them.
  4. We roll out the underlay with overlap and tape the joints. Underlay reduces noise and takes up small uneven spots.
  5. Panels are installed from the far wall towards the door, with joints staggered by at least 30 cm. Wedges are placed along the walls to keep an 8–10 mm expansion gap.
  6. The last panels in each row are cut with a jigsaw or circular saw. In awkward spots (pipes, thresholds, corners) we make accurate cut-outs.
  7. We fit skirting boards and thresholds. We check there are no gaps, no creaks, and that every lock has fully clicked together.

Common mistakes people make installing laminate themselves

What to prepare before the technician arrives

A real case from Warsaw

A client in the Bemowo district bought a second-hand flat — 55 square metres, with old linoleum over concrete throughout. He wanted laminate in every room apart from the bathroom. We began with demolition: removed the linoleum and found adhesive residue plus a screed with up to 4 mm of unevenness. Two rooms needed a self-levelling compound; in the third, sanding was enough. A day later, once the compound had cured, we rolled out the underlay and installed the laminate. In total — 48 square metres over two working days. We also trimmed three doors that would not close after the new floor was laid, fitted skirting boards around the perimeter, and installed thresholds in every doorway. The client moved in the next day — the floor is flat, nothing creaks, and the doors close properly. Three months later he messaged us saying everything is still perfect (compatible with Quick-Step, Egger, Kronopol and similar).

Frequently asked questions

What laminate should I choose?

For a flat, class 32 is enough; for an office or hallway, choose class 33. An 8 mm thickness is the best middle ground. Vinyl planks are a good choice for kitchens and rooms with higher moisture.

Does the floor need levelling?

If the deviation exceeds 2 mm per metre — yes, absolutely. Otherwise the locks will stay under stress and sooner or later break.

How long does installation take?

A standard room of 15–20 m² takes around 3 to 4 hours on a level subfloor. With demolition and levelling, allow a full day.

Can I lay laminate over old linoleum?

Yes, as long as the linoleum lies flat with no bubbles or waves. It works as extra underlay. But removing it is the better option — there may be moisture or unevenness underneath.

What if the laminate buckles?

Most often the reason is a missing expansion gap. Remove the skirting, trim the panels 8–10 mm back from the wall, and let the floor settle. If the buckling comes from water damage, the affected panels need to be replaced.

Do you install vinyl planks as well?

Yes, we install both vinyl (LVT/SPC) and classic laminate. Vinyl needs a smoother subfloor but holds up longer in damp areas.

Do you work on weekends?

Yes, Saturdays and Sundays included. Book in advance if you can — weekends are our busiest days.

Are materials included in the price?

No, materials (laminate, underlay, skirting) are bought by the client. We help calculate quantities and can recommend a brand.

Who does the work and how we operate

Installation is done by technicians with hands-on experience in floor coverings — laminate, vinyl, parquet. We do not send beginners — the person who comes out knows the difference between a Click and a Lock joint, understands why the expansion gap matters, and can cut a panel neatly around a pipe. We cover all of Warsaw and the nearby suburbs: Bemowo, Wola, Mokotow, Ursynow, Wilanow — distance is not a problem. If you need flooring installed, call or message us. We reply within an hour and arrange a time that suits you.

Scan to open the article online