www.handyman24.eu/en · EN

Curtain Rail & Roller Blind Installation Warsaw — Prices & Service

Warszawa · 11.04.2026 · ≈ 4 min read

You’ve bought curtain rails, roller blinds, or venetian blinds — now they need fitting to the wall without chipping the plaster or ending up uneven. We handle roller shutter installation and blinds fitting in Warsaw every day. Below you can see how the job goes and what the price looks like.

Curtain Rod Installation Warsaw Price — Current Rates

Prices depend on the kind of covering (curtain rail, roller blind, venetian) and the wall surface (concrete, brick, plasterboard). Here are the current rates for window covering installation in Warsaw.

Service min max
Roller shutter installation 200 zł 350 zł
Blinds installation 200 zł 350 zł
Curtain rod repair 80 zł 150 zł
Roller blind cord / mechanism replacement 120 zł 250 zł
Roller blind / venetian blind repair 150 zł 350 zł

Mounting hardware (wall plugs, screws) is included. The curtain rail or blind itself is bought by the client — we help choose the right type and size. For combined curtain rod and dryer installation, check our multi-service option.

How We Install Curtain Rails and Blinds — Step by Step

Blind Fitting Service Warsaw — Our Process

  1. Measure and mark. We use a laser level to set out the bracket positions — even a 2mm difference is visible on a 2-metre rail.
  2. Drill and anchor. Concrete or brick gets suitable wall plugs. Plasterboard gets toggle bolts or dedicated cavity anchors. We choose the fixing to suit the wall.
  3. Mount brackets. Brackets are screwed in solidly, then we check the level again.
  4. Attach the rail or blind. The curtain rail is clicked or screwed onto the brackets. The roller blind cassette is snapped into place. Venetian blinds are fixed with clips.
  5. Test. Curtains are hung and pulled across. Blinds go up and down. The chain mechanism is checked to make sure it runs smoothly. We leave only when everything works properly.

Common Mistakes With Curtain Rails and Blinds

What to Prepare Before the Handyman Arrives

No-Drill Curtain Rail Warsaw — Your Checklist

Real Example — Blinds in a New Flat in Białołęka

A family who had just moved into a new flat in Białołęka needed roller blinds in 5 rooms and curtain rails in the living room and bedroom. We fitted 7 roller blinds (recess-mounted, with no drilling into the frame), 2 ceiling-mounted curtain rails (3m each), and checked every mechanism. The flat went from bare windows to fully finished in around 3 hours.

FAQ — Curtain Rail and Blind Installation in Warsaw

How long does it take to install one curtain rail?

One curtain rail takes 15–30 minutes depending on the wall type and rail length. Roller blinds: 10–20 minutes each.

Can you install blinds without drilling?

Yes — clip-on roller blinds fit onto the window frame without screws. Tension curtain rods also don’t need drilling. We’ll advise what will work with your windows.

Do you install electric roller blinds?

Yes. We fit the cassette, connect the motor, and pair the remote. If a power outlet is needed nearby, we can install one.

Why Hire a Handyman for Curtain and Blind Installation?

Straight rails, solid fixings, and blinds that actually run properly — that’s what you get when the job is done by a professional. We work across Warsaw and bring everything needed: laser level, drill, anchors, screwdriver. One visit, all windows sorted, no dust left behind.

Scan to open the article online