Laminate is among the most common floor finishes in Warsaw flats. It’s light, handy, and fast to install. But that “fast” only happens when the base is prepared properly: a flat screed, suitable underlay, and proper expansion gaps along the walls. Miss even one of these and after a few months the floor will start creaking, lifting, or opening at the joints. We install panels all over Warsaw — from Ursynów to Białołęka.

Up-to-date prices are in the table below. The final cost depends on the size, how awkward the room is (alcoves, corners, thresholds), and the kind of panels. If the screed has to be levelled or the old flooring removed first, that is charged separately. Fixings and consumables are included; materials (panels, underlay) are provided by the client.
| Service | min | max |
|---|---|---|
| Floor panel removal | 15 zł/m² | 25 zł/m² |
| Floor panel installation | 70 zł/m² | 90 zł/m² |
| Floor panel replacement | 70 zł/m² | 100 zł/m² |
| Vinyl panel installation | 80 zł/m² | 120 zł/m² |
| Baseboard installation | 30 zł/mb | 45 zł/mb |
| Baseboard removal | 15 zł/mb | 25 zł/mb |
| Old flooring removal | 12 zł/m² | 20 zł/m² |
| Carpet installation | 35 zł/m² | 60 zł/m² |
| PVC flooring installation | 45 zł/m² | 75 zł/m² |
| Glue-down flooring installation | 45 zł/m² | 75 zł/m² |
| Parquet sanding | 70 zł/m² | 110 zł/m² |
| Parquet varnishing | 45 zł/m² | 75 zł/m² |
| Parquet oiling | 55 zł/m² | 90 zł/m² |
| Parquet gap filling | 25 zł/m² | 45 zł/m² |
| Floor threshold installation | 180 zł | 300 zł |
| Door trimming after floor installation | 120 zł | 250 zł |




New-build in Wilanów, 40 m² living room plus hallway. The developer handed over the flat with a screed, but the dips reached 5 mm — first a self-levelling compound had to be applied. On the next day the technician installed 8 mm laminate on a cork underlay. The whole job took two visits: one day for levelling, one day for laying the floor. The owners cut costs by booking both stages with the same technician and not paying a second call-out fee (compatible with Quick-Step, Egger, Kronopol and similar).
For a flat, 8 mm is the best middle ground. 7 mm is the budget choice — the thinner it is, the noisier it gets. 10–12 mm is quieter and more durable, but it costs more.
A standard room of 15–20 m² — 3 to 4 hours. A 50 m² flat — one working day.
Yes, laminate cannot be installed on top of laminate. The old covering has to be removed.
Yes, but you need laminate approved for underfloor heating and a thin underlay (2–3 mm).
The client buys the panels, underlay, and film. The technician can also help work out the quantities.

An experienced fitter notices things a beginner will overlook: a crooked screed, the wrong underlay, faulty panels straight out of the pack. We work across all of Warsaw — get in touch, and we’ll quote the job and arrange a time that works for you.