Glue-down installation cost

The cost is based on the flooring material, the adhesive, and the total area. You can find current rates in the table. The adhesive is most often bought by the client (the technician will recommend the brand and amount).
| Service | Price |
|---|---|
| Floor panel removal | 20–30 zł/m² |
| Floor panel installation | 50–90 zł/m² |
| Floor panel replacement | 70–100 zł/m² |
| Vinyl plank installation | 45–80 zł/m² |
| Skirting board installation | 25–45 zł/mb |
| Skirting board removal | 8–12 zł/mb |
| Old flooring removal | 20–30 zł/m² |
| Carpet laying | 55–70 zł/m² |
| PVC flooring laying | 45–75 zł/m² |
| Glued flooring laying | 45–75 zł/m² |
| Parquet sanding | 45–55 zł/m² |
| Parquet varnishing | 40–60 zł/m² |
| Parquet oiling | 25–45 zł/m² |
| Parquet filling | 25–45 zł/m² |
| Floor threshold installation | 180–300 zł |
| Door trimming | 200–400 zł |
Indicative prices. Ranges for a typical scope. Fixings included, materials separate. Minimum order 300 zł.
Price ranges and offers from tradespeople: apartment fit-out in Warsaw.
How the glue-down process works

- The substrate is inspected with a level: for glue-down, the variance must not exceed 2 mm over 2 m.
- The screed is primed to improve adhesion.
- Adhesive is applied with a notched trowel onto the screed (not onto the flooring).
- The flooring is placed and pressed in — sheet material is rolled, tiles are tapped into place.
- Any excess adhesive is cleaned off right away: after it dries, removing it is very difficult.
- The floor is left to cure for 24–48 hours: no walking on it during this period.
Common mistakes

- Using too much adhesive: it pushes up through the joints and marks the surface.
- Walking on newly laid flooring: the pieces shift before the adhesive cures.
- Skipping primer on the screed — the bond is weaker, and the floor starts lifting after a year.
- Choosing the wrong adhesive: each flooring type has its own recommended product.
- Gluing onto a damp screed: the adhesive will not hold, and mould forms underneath.
What to prepare

- Screed flat, dry, and primed.
- Flooring kept in the flat for at least 24 hours to acclimatise.
- Adhesive and primer bought in advance (confirm the brand with the technician).
- The room emptied of furniture.
- After installation — no foot traffic for 24–48 hours.
Glue-down flooring installation in practice: a Warsaw case

A flat in Żoliborz, living room 28 m². The owner picked 14 mm engineered hardwood and chose to glue it instead of laying it as a floating floor to get rid of creaking. The technician primed the screed, and on the following day installed the boards with two-component adhesive. The furniture was moved back after 48 hours. The floor is quiet and completely solid.
Frequently asked questions
When is glue-down better than floating?
When quiet matters (no creaking), over underfloor heating (better heat transfer), and in large rooms (no expansion joints required).
Can a glued floor be removed later?
Yes, but it takes more work and more time than taking up a floating floor. The covering is often damaged during removal.
Book a glue-down installation

Glue-down gives you a quiet, long-lasting floor. Tradespeople work across Warsaw: post a request in the HandyMan24 app and they will send their offers.
Order in the app
Describe the job, add photos and the address. Tradespeople send their own prices and dates, and you pick one of the offers.
Open the app

