Old laminate may be swollen, split, or just past its best — getting to a new floor starts with proper removal. On paper it looks simple, but the job has its tricks: click-lock panels have to come apart in the right order, glued-down ones need lifting without chewing up the screed, and the underlay underneath usually has to come out as well. We work all over Warsaw — from Ochota to Targówek — and come fully equipped.

Up-to-date prices are in the table below. The final cost is affected by the size of the area, the panel type (click-lock lifts faster, glue-down takes more time), and the state of the subfloor. Waste removal is priced separately. If you’re planning to install a new floor right after — doing both during one visit comes out cheaper.
| Service | min | max |
|---|---|---|
| Floor panel removal | 15 zł/m² | 25 zł/m² |
| Floor panel installation | 70 zł/m² | 90 zł/m² |
| Floor panel replacement | 70 zł/m² | 100 zł/m² |
| Vinyl panel installation | 80 zł/m² | 120 zł/m² |
| Baseboard installation | 30 zł/mb | 45 zł/mb |
| Baseboard removal | 15 zł/mb | 25 zł/mb |
| Old flooring removal | 12 zł/m² | 20 zł/m² |
| Carpet installation | 35 zł/m² | 60 zł/m² |
| PVC flooring installation | 45 zł/m² | 75 zł/m² |
| Glue-down flooring installation | 45 zł/m² | 75 zł/m² |
| Parquet sanding | 70 zł/m² | 110 zł/m² |
| Parquet varnishing | 45 zł/m² | 75 zł/m² |
| Parquet oiling | 55 zł/m² | 90 zł/m² |
| Parquet gap filling | 25 zł/m² | 45 zł/m² |
| Floor threshold installation | 180 zł | 300 zł |
| Door trimming after floor installation | 120 zł | 250 zł |




A flat in Praga-Południe, 45 m² — the owners had bought a resale property with 12-year-old laminate. The panels had lifted at the doorways and in the hallway; the click-lock joints had opened up in several spots. The technician removed the skirting boards and took up the laminate in under four hours. Under it was old polyethylene foam underlay, flattened almost completely — he removed all of it. The screed was in decent condition apart from one hairline crack, which he filled with a rapid-set compound. By the next morning, the owners were already installing new vinyl plank flooring on a clean, even base. The point: removing old laminate is not just about tearing it out — it is about getting the substrate ready for whatever comes next (compatible with Quick-Step, Egger, Kronopol and similar).
In theory yes, but it is not advised. The floor level will rise, doors may stop opening, and flaws in the old layer will show through.
Click-lock laminate — around 20–30 m² per hour. Glue-down — roughly half that pace. A 15 m² room takes 30 minutes to an hour.
Click-lock — yes, if the locking system is still intact. Glue-down — almost never.
Yes, old underlay loses its performance after 5–7 years. A new floor needs new underlay.
Laminate counts as construction waste. In Warsaw you can bring it to a PSZOK facility or arrange removal with the technician.
Yes, if the subfloor is in good shape and the material is on site. Removal and installation in one day is a normal setup.

Floor removal is done by flooring specialists. We know how to take apart every type of floor without damaging the base underneath. We work across all of Warsaw — call or message us, and we’ll check the scope and arrange a convenient date.