The parquet has gone darker, collected scratches, and the finish is worn away — but the wood itself is still sound and can be brought back. Sanding takes off a thin top layer together with the old finish and exposes clean wood underneath. Once sanded, the floor looks like new again — it just needs lacquer or oil on top. It costs much less than a full replacement and usually takes only one to two days. We sand parquet all over Warsaw — from Stary Mokotów to Bródno.

The cost is based on the floor area, the state of the parquet, and how many layers of old finish are on it. Current rates are shown in the table. Lacquer or oil is charged separately (you can order it together).
| Service | min | max |
|---|---|---|
|
Floor panel removal
Book this service → |
15 zł/m² | 25 zł/m² |
|
Floor panel installation
Book this service → |
70 zł/m² | 90 zł/m² |
|
Floor panel replacement
Book this service → |
70 zł/m² | 100 zł/m² |
|
Vinyl panel installation
Book this service → |
80 zł/m² | 120 zł/m² |
|
Baseboard installation
Book this service → |
30 zł/mb | 45 zł/mb |
|
Baseboard removal
Book this service → |
15 zł/mb | 25 zł/mb |
|
Old flooring removal
Book this service → |
12 zł/m² | 20 zł/m² |
|
Carpet installation
Book this service → |
35 zł/m² | 60 zł/m² |
|
PVC flooring installation
Book this service → |
45 zł/m² | 75 zł/m² |
|
Glue-down flooring installation
Book this service → |
45 zł/m² | 75 zł/m² |
|
Parquet sanding
Book this service → |
70 zł/m² | 110 zł/m² |
|
Parquet varnishing
Book this service → |
45 zł/m² | 75 zł/m² |
|
Parquet oiling
Book this service → |
55 zł/m² | 90 zł/m² |
|
Parquet gap filling
Book this service → |
25 zł/m² | 45 zł/m² |
|
Floor threshold installation
Book this service → |
180 zł | 300 zł |
|
Door trimming after floor installation
Book this service → |
120 zł | 250 zł |




An older flat in Mokotów, 45 m² of 1960s oak herringbone parquet. The lacquer was worn right through to bare wood in the walkways, and several blocks had come loose. The technician glued the loose blocks back down, filled the gaps, and went through three grits. The next day — two coats of polyurethane lacquer. Result: the parquet looks new again, the herringbone pattern stands out more clearly, and the grain really shows. The owners saved a lot of money — replacing parquet like this would have cost five times more (compatible with Quick-Step, Egger, Kronopol and similar).
That depends on the thickness. Solid parquet at 15 mm — three to four times over its lifetime. Engineered board with a 4 mm wear layer — once or twice.
Sanding 20–30 m² — one day. Lacquering — one more day. The floor can handle foot traffic 24–48 hours after the final coat.
Very little. Modern machines come with built-in dust extraction and filters. But sheeting over the doorways is still necessary.

We’ll give your parquet a second life. We work across all of Warsaw — message us, and we’ll check the condition and arrange a date.