New flooring looks good — right up to the moment you try to shut a door and it rubs along the floor. Laminate, vinyl plank, or engineered wood lifts the floor level by 8–15 mm, and all at once the interior doors in the flat start scraping, sticking, or not closing at all. The solution is simple: trim the bottom of each door to suit the new floor height and leave the right ventilation gap. One door usually takes 20–40 minutes. We trim doors across Warsaw — we recently completed one job in Ursynow and another near Kabaty.

The cost depends on how many doors need cutting, what the doors are made of (solid wood, MDF, hollow-core), and whether the frame needs trimming as well. Current rates for all flooring services are listed in the table below.
| Service | min | max |
|---|---|---|
| Floor panel removal | 15 zł/m² | 25 zł/m² |
| Floor panel installation | 70 zł/m² | 90 zł/m² |
| Floor panel replacement | 70 zł/m² | 100 zł/m² |
| Vinyl panel installation | 80 zł/m² | 120 zł/m² |
| Baseboard installation | 30 zł/mb | 45 zł/mb |
| Baseboard removal | 15 zł/mb | 25 zł/mb |
| Old flooring removal | 12 zł/m² | 20 zł/m² |
| Carpet installation | 35 zł/m² | 60 zł/m² |
| PVC flooring installation | 45 zł/m² | 75 zł/m² |
| Glue-down flooring installation | 45 zł/m² | 75 zł/m² |
| Parquet sanding | 70 zł/m² | 110 zł/m² |
| Parquet varnishing | 45 zł/m² | 75 zł/m² |
| Parquet oiling | 55 zł/m² | 90 zł/m² |
| Parquet gap filling | 25 zł/m² | 45 zł/m² |
| Floor threshold installation | 180 zł | 300 zł |
| Door trimming after floor installation | 120 zł | 250 zł |




A 60 m² flat in Ursynow had vinyl click flooring (5.5 mm) laid over the old screed with a 2 mm underlay — 7.5 mm higher overall. Four bedroom doors and one bathroom door no longer closed. The handyman came with a track saw and guide rail. Each door was removed from its hinges, marked using a sample of the vinyl plus 7 mm clearance, cut, sanded, sealed along the bottom edge, and hung back. All five doors were done in a little over two hours. The bathroom door was left with a wider 12 mm gap for better ventilation because there was no mechanical extract fan. Now every door opens and closes smoothly without scraping, and the bottom edges are protected against moisture (compatible with Quick-Step, Egger, Kronopol and similar).
Yes, but carefully. Hollow-core doors have a solid bottom rail of about 30–50 mm. If more needs to come off, we glue in a new timber insert and reseal the edge. The handyman will check on site how much material is there.
If the new flooring runs into the frame, yes. We undercut the frame with a multi-tool so the floor and skirting board can slide neatly underneath.
The standard gap is 5–8 mm above the finished floor. In bathrooms it can be 10–12 mm for better air circulation. Anything below 5 mm risks the door catching when the flooring expands in warmer months.
One door: 20–40 minutes. A flat with four to six doors usually takes two to three hours including measuring, cutting, and sealing.

New flooring should not turn into a daily battle with your doors. Give us a call — we will measure, trim, and seal every door properly. We bring our own tools and work across all of Warsaw.