www.handyman24.eu/en · EN

Furniture, door, window and floor protection with film in Warsaw

Warszawa · 10.02.2026 · ≈ 4 min read

Before any painting or plastering starts, everything that must stay clean has to be covered: floors, furniture, windowsills, doors, sockets. There’s no skipping this — it’s a required part of the job. Without proper protection, one drop of paint on laminate flooring can end up costing more than painting the whole room. We do protective covering across Warsaw before every painting or plastering stage.

How much does it cost and what affects the price

You’ll find the current prices in the table below. The final cost is affected by the size of the area, the kind of protection used (painter’s film, cardboard for floors, masking tape), and how many items need covering. If protection is included in a full painting package — the price usually comes out lower than booking it on its own. Tape and fixings are included. Film and cardboard are consumables, charged additionally.

Service min max
Protection of furniture, doors, windows and floors with film 10 zł/m² 15 zł/m²
Cleaning and washing walls before painting 15 zł/m² 25 zł/m²
Filling holes and damages 20 zł/m² 35 zł/m²
Wall leveling after tile removal 45 zł/m² 70 zł/m²
Ceiling leveling 45 zł/m² 70 zł/m²
Priming before painting 15 zł/m² 25 zł/m²
Gypsum putty application 55 zł/m² 90 zł/m²
Painting walls / ceilings in one color (2 coats) 30 zł/m² 45 zł/m²
Painting walls in different colors 35 zł/m² 55 zł/m²
Oil-based painting 55 zł/m² 80 zł/m²
Pipe painting (water, heating, gas) 20 zł/mb 35 zł/mb
Radiator painting 25 zł 45 zł
Window painting 150 zł/m² 300 zł/m²
Stripping old paint and varnish from wood 30 zł/m² 70 zł/m²
Wood impregnation 45 zł/m² 75 zł/m²
Wallpaper removal 20 zł/m² 35 zł/m²
Ceiling moulding installation 30 zł/mb 55 zł/mb

How the on-site work goes

  1. The technician checks the room and identifies what needs protection: floors, furniture, windows, doors, skirting boards, sockets.
  2. Smaller furniture is taken out, and larger pieces are moved to the middle and covered.
  3. Floors are protected with film or cardboard, then fixed with masking tape around the edges.
  4. Door and window frames are covered with film — this keeps off splashes and drips.
  5. Sockets, switches, and skirting boards are masked separately.
  6. Every joint is inspected — there should be no gaps between the film and the wall.
  7. Once painting is finished, the protection is removed carefully and all waste is taken away.

Common customer mistakes (and how to avoid them)

What to prepare before the technician arrives

A real case from Warsaw

A client in Wola booked painting for two rooms and a hallway. To save money, they covered the floors with old bed sheets. After the ceiling was painted, emulsion drops fell onto the laminate — the fabric let it through right away. They had to call us to sort it out: we protected everything properly with film and cardboard, then repainted the ceiling from the beginning. The laminate was saved, but only because the paint was still wet. If it had dried, the marks would have stayed for good. The takeaway is simple: protection is not the place to save money.

Frequently asked questions

Do I need to protect furniture if we’re only painting the ceiling?

Yes. A roller throws paint within a 1–2 metre radius. Even with careful painting, drops still land on furniture and the floor.

What type of film is best?

For floors — thick builder’s film or cardboard. For furniture — thin painter’s film. Newspapers and bed sheets are not suitable.

Is protection included in the painting price?

It depends on the agreement. Protection is often listed as a separate item, but when you order the full package — the total usually comes out lower.

Can we just cover the furniture instead of moving it out?

Yes, large furniture is moved to the centre and covered. Smaller items are better taken out — it’s quicker and cleaner.

How long does it take to protect one room?

30–60 minutes depending on how much furniture is inside and the floor area.

Do you remove the film after the job?

Yes, the protection is removed carefully and the waste is collected. That’s included in the service.

Who does the work

This protective work is done by experienced painters who focus on proper room preparation. We work across all of Warsaw. Call or message us — we’ll tell you what should be covered and how much time the job will need.

Scan to open the article online