Bought an induction hob and found only a standard 16 A socket on the wall? Or do you need to hook up an electric oven, air conditioner, or workshop equipment — but there’s no separate line for it? A 230 or 400 V power socket fixes that. But fitting one on your own without knowing the consumer unit setup and proper cable size is a bad idea. We work all over Warsaw: from Ursynow to Zoliborz, arriving with a tester, tools, and the correct cable.

Important: work on 230/400 V lines carries a real risk of electric shock and fire. If you’re not sure what state the wiring or consumer unit is in — don’t try to connect anything yourself. Call a professional.

How much does it cost and what affects the price

Up-to-date prices for all electrical installation services are listed in the table below. The price of fitting a power socket depends on a few things: whether a new cable has to be pulled from the consumer unit or the point is already ready, the type of socket needed (single-phase 230 V or three-phase 400 V), and whether there’s a free breaker slot in the consumer unit. Fixings are included in the labour price. Cable, socket, and breaker are billed separately if the client hasn’t bought them beforehand.

Service min max
Light switch installation 50 zł/szt 90 zł/szt
Light switch replacement 60 zł/szt 60 zł/szt
Light switch repair 60 zł/szt 120 zł/szt
Electrical socket installation 80 zł/szt 120 zł/szt
Electrical socket replacement 50 zł/szt 80 zł/szt
Electrical socket repair 60 zł/szt 100 zł/szt
Electrical point installation 120 zł/pkt 180 zł/pkt
Wall chasing for wiring 40 zł/mb 70 zł/mb
Electrical wiring installation 15 zł/mb 30 zł/mb
Junction box wiring connection 40 zł/szt 80 zł/szt
Lighting installation (lamp, chandelier) 80 zł/szt 150 zł/szt
Lighting replacement 150 zł/szt 150 zł/szt
Lighting repair 120 zł 250 zł
LED strip installation 60 zł/mb 90 zł/mb
LED transformer installation 150 zł/szt 220 zł/szt
Light bulb / halogen replacement 30 zł/szt 50 zł/szt
Power socket installation 230/400 V 120 zł/szt 220 zł/szt

Types of power sockets and when each is needed

Single-phase 230 V (16 A or 20 A) — good for most home appliances: an oven up to 3.5 kW, an induction hob up to 3.7 kW, a high-power kettle, or a heater. It looks like a normal socket but with earthing, and it is wired to a dedicated breaker using a 2.5 or 4 mm2 cable.

Single-phase 230 V (32 A) — for heavy single-phase loads: an induction hob up to 7 kW, an electric cooktop, or an industrial heater. It needs a 6 mm2 cable and its own 32 A breaker.

Three-phase 400 V (16 A or 32 A) — required for equipment rated from 5 to 22 kW: a three-phase induction hob, workshop machines, a compressor, or a powerful air conditioning unit. It is connected with a five-core cable (3 phases + neutral + earth). Three-phase supply is not available in every Warsaw flat — this has to be checked first.

If you’re not sure which type you need — send a photo of the appliance rating plate (the label with the wattage on the back). Our technician will check whether a single-phase line will do or if three-phase is needed (compatible with Legrand, Schneider Electric, ABB and similar).

How the on-site work goes

  1. You explain the job: which appliance needs to be connected, and send photos of the consumer unit and the installation spot.
  2. The technician works out the socket and cable type and gives an estimated price.
  3. On site — the consumer unit is checked: is there a spare breaker, what size is the supply cable, is there enough capacity.
  4. The cable is run from the consumer unit to the point: in trunking, chased into the wall, or behind skirting — depending on the conditions.
  5. A breaker (or RCBO) is fitted in the consumer unit and the cable is connected.
  6. The power socket is mounted and tested with a multimeter: voltage, earthing, correct phase rotation.
  7. The appliance is started for a test, and cable and connection temperatures are checked for 10–15 minutes.

Safety requirements

This is not a regular socket. A power line carries several times the load of a standard circuit. Mistakes in the wiring lead to melted contacts, short circuits, appliance damage, and fire. Minimum requirements:

Common customer mistakes (and how to avoid them)

What to prepare before the technician arrives

A real case from Warsaw

A client in Mokotow bought a 7.4 kW Bosch induction hob. The flat had only a standard 16 A socket on a 2.5 mm2 cable. The breaker tripped whenever three burners were running. Our technician checked the consumer unit — there was space, and the supply was three-phase. We pulled a dedicated 5×2.5 mm2 cable from the consumer unit for a three-phase connection and installed a 16 A RCBO across three phases. The socket was fitted behind the hob in a back box. We changed the terminal links on the hob’s connection block to three-phase mode. After connection, all phases were tested, and the hob was run at full power — everything stayed stable, with no cable heating. The job took about 3 hours. The lesson: before buying high-power appliances, check what supply your flat has and whether the capacity is enough.

Frequently asked questions

What makes a power socket different from a regular one?

It is designed for a higher load — 20 to 32 A — and connected by a dedicated cable to its own breaker in the consumer unit. A regular socket is 16 A on a shared circuit.

Does an induction hob need a three-phase socket?

That depends on the model. Hobs up to 3.7 kW run on single-phase. Hobs from 5 kW are better connected to three phases — the load is spread more evenly and the cable can be thinner.

Can a power socket be installed without chasing?

Yes, if the cable is run in surface trunking or behind the kitchen units. That is quicker and cheaper.

What’s included in the price?

Socket fitting, connection at the consumer unit, and testing of the line. Fixings are included. Cable, socket, and breaker are charged separately.

How quickly can you come?

Often the same day or the next one. Urgent call-outs have a surcharge. We cover all of Warsaw.

Can I buy the cable and socket myself?

Yes, but confirm the type and size with the technician before buying. The wrong cable means the job has to be redone.

Can an oven and hob share one socket?

No. Each high-power appliance needs its own separate line and breaker. This is a safety requirement.

Who does the work

Electrical installation is done by technicians with real hands-on experience in power connections. We work across all of Warsaw and nearby suburbs. Minimum order — from 200 zl. To book, call or message us — we’ll get back to you within an hour and explain what to prepare before the visit.