Glue-down flooring installation in Warsaw — solid hold, no creaking

Gluing is the most secure way to fix a floor covering. Linoleum, vinyl tiles, engineered hardwood — bonded to the screed, they stay put, do not creak, and do not shift. The method costs more than a floating installation but the result lasts longer. We glue flooring across Warsaw — from Wola to Wawer.

Glue-down installation cost

The price depends on the flooring type, adhesive, and area. Current rates are in the table. The adhesive is usually supplied by the client (the technician will advise on the brand and quantity).

Serviceminmax
Floor panel removal 15 zł/m²25 zł/m²
Floor panel installation 70 zł/m²90 zł/m²
Floor panel replacement 70 zł/m²100 zł/m²
Vinyl panel installation 80 zł/m²120 zł/m²
Baseboard installation 30 zł/mb45 zł/mb
Baseboard removal 15 zł/mb25 zł/mb
Old flooring removal 12 zł/m²20 zł/m²
Carpet installation 35 zł/m²60 zł/m²
PVC flooring installation 45 zł/m²75 zł/m²
Glue-down flooring installation 45 zł/m²75 zł/m²
Parquet sanding 70 zł/m²110 zł/m²
Parquet varnishing 45 zł/m²75 zł/m²
Parquet oiling 55 zł/m²90 zł/m²
Parquet gap filling 25 zł/m²45 zł/m²
Floor threshold installation 180 zł300 zł
Door trimming after floor installation 120 zł250 zł

How the glue-down process works

  1. The substrate is checked with a level — glue-down requires no more than 2 mm variance over 2 m.
  2. The screed is primed for better adhesion.
  3. Adhesive is spread with a notched trowel on the screed (not on the flooring).
  4. The flooring is laid and pressed down — sheet material is rolled, tiles are tapped.
  5. Excess adhesive is removed immediately — once dry it is very hard to clean off.
  6. The floor cures for 24–48 hours — no foot traffic during this time.

Common mistakes

  • Too much adhesive — it squeezes up at joints and stains the surface.
  • Walking on freshly laid flooring — elements shift before the adhesive sets.
  • Not priming the screed — adhesion is weaker, the floor lifts after a year.
  • Wrong adhesive — every flooring type has its own recommended product.
  • Gluing on a damp screed — the adhesive won’t bond, mould develops underneath.

What to prepare

  • Screed level, dry, and primed.
  • Flooring in the flat for at least 24 hours to acclimatise.
  • Adhesive and primer purchased (check the brand with the technician).
  • Room cleared of furniture.
  • After installation — no foot traffic for 24–48 hours.

A real case from Warsaw

A flat in Żoliborz, living room 28 m². The owner chose 14 mm engineered hardwood and decided to glue rather than float it to eliminate creaking. The technician primed the screed and the next day laid the boards on two-component adhesive. Furniture went back in after 48 hours. The floor is silent and rock-solid.

Frequently asked questions

When is glue-down better than floating?
When silence matters (no creaking), over underfloor heating (better heat transfer), and in large rooms (no expansion joints needed).

Can a glued floor be removed later?
Yes, but it is harder and slower than dismantling a floating floor. The covering is often damaged during removal.

Book a glue-down installation

Glue-down means silence and durability. We work across Warsaw — call or message us.