The chase is prepared — now the cable has to be installed. Cable laying means feeding wire through a ready channel or trunking from the junction box to a socket, switch or light point. How well the run is made affects the safety of the entire installation. In Ursynow and Bielany we often replace wiring during renovations — old aluminium circuits do not cope with today’s loads.

The cost is based on the run length, the cable type and the installation method (in a chase, conduit, trunking or behind plasterboard). Chasing is priced separately. Laying includes putting the cable in place, fixing it and terminating both ends. Materials are provided by the client. All electrical service prices are listed in the table.
| Service | min | max |
|---|---|---|
| Light switch installation | 50 zł/szt | 90 zł/szt |
| Light switch replacement | 60 zł/szt | 60 zł/szt |
| Light switch repair | 60 zł/szt | 120 zł/szt |
| Electrical socket installation | 80 zł/szt | 120 zł/szt |
| Electrical socket replacement | 50 zł/szt | 80 zł/szt |
| Electrical socket repair | 60 zł/szt | 100 zł/szt |
| Electrical point installation | 120 zł/pkt | 180 zł/pkt |
| Wall chasing for wiring | 40 zł/mb | 70 zł/mb |
| Electrical wiring installation | 15 zł/mb | 30 zł/mb |
| Junction box wiring connection | 40 zł/szt | 80 zł/szt |
| Lighting installation (lamp, chandelier) | 80 zł/szt | 150 zł/szt |
| Lighting replacement | 150 zł/szt | 150 zł/szt |
| Lighting repair | 120 zł | 250 zł |
| LED strip installation | 60 zł/mb | 90 zł/mb |
| LED transformer installation | 150 zł/szt | 220 zł/szt |
| Light bulb / halogen replacement | 30 zł/szt | 50 zł/szt |
| Power socket installation 230/400 V | 120 zł/szt | 220 zł/szt |


Warning: cable laying is serious work. The wrong cross-section, a bad joint or a routing error can cause overheating, short circuits and fire. It should be done by a qualified electrician.


We had a full renovation of a two-room flat in Ursynow: old aluminium wiring and only two breakers for the entire flat. The client wanted separate circuits for the kitchen, bathroom, sockets and lighting. We installed about 80 metres of copper NYM cable: 3×2.5 for sockets, 3×1.5 for lighting, 3×4 for the oven and hob. All runs were in conduit, with WAGO connections in junction boxes. We also fitted a new consumer unit with RCBOs. The whole job took two days including chasing (compatible with Legrand, Schneider Electric, ABB and similar).
In a chase — code does not require it, but we recommend it. Behind plasterboard and in timber structures — compulsory.
Yes — in surface-mounted trunking or behind plasterboard. A good option when the renovation does not include wet trades.
The standard is 2.5 mm² for socket circuits and 1.5 mm² for lighting. For hobs and ovens — 4 mm² or 6 mm².
30–60 metres, depending on how complicated the route is and how many connections there are.
Yes — we connect it to the breakers, then check and test every circuit.

We install electrical cable across Warsaw: in chases, conduit and trunking. Copper cable, solid connections, every circuit checked. Contact us — we will come out, lay the cable and connect it.