You’ve bought a new chandelier, want spotlights in the hallway, or need a wall light in the bedroom — that means you need an electrician. Light installation includes securing the fitting to the ceiling or wall, wiring it in, and checking that everything works. It may look simple, but there are a lot of small points to get right: a heavy chandelier needs stronger fixings, recessed spots require accurate ceiling cut-outs, and a wall light needs the cable brought through the wall. In Mokotow and Zoliborz we often install lights in newly renovated flats — fresh ceilings, loose cables, just waiting to be connected.

The cost depends on the kind of fitting and how tricky it is to mount. A basic ceiling pendant on a hook is fast to install. A heavy chandelier on a bracket with fixings takes a bit more time. Recessed spots are priced according to quantity. The fitting is provided by the client. Up-to-date prices are shown in the table below.
| Service | min | max |
|---|---|---|
| Light switch installation | 50 zł/szt | 90 zł/szt |
| Light switch replacement | 60 zł/szt | 60 zł/szt |
| Light switch repair | 60 zł/szt | 120 zł/szt |
| Electrical socket installation | 80 zł/szt | 120 zł/szt |
| Electrical socket replacement | 50 zł/szt | 80 zł/szt |
| Electrical socket repair | 60 zł/szt | 100 zł/szt |
| Electrical point installation | 120 zł/pkt | 180 zł/pkt |
| Wall chasing for wiring | 40 zł/mb | 70 zł/mb |
| Electrical wiring installation | 15 zł/mb | 30 zł/mb |
| Junction box wiring connection | 40 zł/szt | 80 zł/szt |
| Lighting installation (lamp, chandelier) | 80 zł/szt | 150 zł/szt |
| Lighting replacement | 150 zł/szt | 150 zł/szt |
| Lighting repair | 120 zł | 250 zł |
| LED strip installation | 60 zł/mb | 90 zł/mb |
| LED transformer installation | 150 zł/szt | 220 zł/szt |
| Light bulb / halogen replacement | 30 zł/szt | 50 zł/szt |
| Power socket installation 230/400 V | 120 zł/szt | 220 zł/szt |


Warning: light installation means working at height and working with electricity. A fixture that falls or faulty wiring can be dangerous. Don’t risk it — call a professional.


A client in Mokotow bought a large 8-arm chandelier weighing about 7 kg. The ceiling was concrete; the old hook was narrow and unsteady. We took out the old hook and installed a heavy-duty anchor bolt on two fixings. We connected the chandelier in two groups — 3+5 lamps on a double switch. We checked both modes and tightened each connection. The chandelier is firmly in place, and the light works exactly as it should. The job took about 40 minutes (compatible with Legrand, Schneider Electric, ABB and similar).
Yes, but a mounting platform needs to be installed before the ceiling is stretched. If the ceiling is already in place, the technician will check whether such a platform is there.
A simple pendant — 20–30 minutes. A chandelier with several groups — up to 45 minutes. Several spots — it depends on the number.
Two wires mean live and neutral; the earth is missing. The fitting will work, but there will be no earth protection. Adding earth means running an extra cable.
Only on a mounting platform fixed to the structural ceiling above. If you attach it straight to plasterboard, it will pull out.
Standard fixings (plugs, hooks) are usually included in the kit. Special brackets and platforms — best to confirm beforehand.

We install chandeliers, spotlights, wall lights, and LED panels across Warsaw. Safe mounting, proper wiring, every fitting checked after installation. Contact us — we’ll hang and connect it all in one visit.