Installation cost

Light installation in Warsaw costs 80 to 150 zł per fitting or chandelier; bulb and halogen replacement and LED strip fitting are separate items. The current rates are in the table below. The cost depends on the kind of fitting and how tricky it is to mount. A basic ceiling pendant on a hook is fast to install. A heavy chandelier on a bracket with fixings takes a bit more time. Recessed spots are priced according to quantity. The fitting is provided by the client.
| Service | Price |
|---|---|
| Light switch installation | 50–90 zł/pkt |
| Light switch replacement | 60–90 zł/pkt |
| Light switch repair | 150–350 zł/szt |
| Socket installation | 30–90 zł/pkt |
| Socket replacement | 50–90 zł/pkt |
| Socket repair | 60–250 zł/szt |
| New electrical point | 150–250 zł/pkt |
| Wall chasing for cables | 40–80 zł/mb |
| Running electrical cables | 15–50 zł/mb |
| Junction box wiring | 80–400 zł/szt |
| Light installation (lamp, chandelier) | 80–550 zł/pkt |
| Light fixture replacement | 150–450 zł/szt |
| Lighting repair | 120–350 zł |
| LED strip installation | 60–90 zł/mb |
| LED transformer installation | 150–220 zł/szt |
| Bulb and halogen replacement | 30–50 zł/szt |
| Power socket installation 230/400 V | 150–350 zł/pkt |
Indicative prices. Ranges for a typical scope. Fixings included, materials separate. Minimum order 300 zł.
Price ranges and offers from tradespeople: light fitting in Warsaw.
What fittings get installed
- Ceiling chandeliers: hung on a hook or mounting plate.
- Wall lights (sconces) — attached to the wall and wired to the outlet.
- Recessed spotlights: cut into a suspended ceiling or plasterboard.
- Surface-mount LED panels: fixed to the ceiling and connected.
- Track systems — rail-mounted with adjustable heads.
- Pendant lights: ceiling-mounted with adjustable drop height.
How light fitting installation is done

- Tradespeople switch off the lighting circuit.
- Tradespeople find the fixing point and scan the ceiling for rebar, pipes, and existing wiring.
- Tradespeople install the mounting: hook, bracket, or cut an opening for a spot.
- Tradespeople connect the cables: live, neutral, earth (if present). For multi-arm chandeliers they divide them across switch gangs.
- Tradespeople fasten the fitting to the mounting.
- Tradespeople turn the power back on and test every function.
Common mistakes

- Mounting a heavy chandelier on plastic plugs: sooner or later it will come loose.
- Skipping a ceiling scan before drilling, and hitting rebar or a cable.
- Wiring without earth where it is required (bathroom).
- Confusing wire groups: one switch gang turns on the wrong lamps.
- Ignoring dimmer compatibility with LEDs — the light starts flickering.
Warning: light installation means working at height and working with electricity. A fixture that falls or faulty wiring can be dangerous. Don’t risk it: call a professional.
What to prepare

- Buy the fitting and make sure it includes mounting hardware (plate, hook, screws).
- Check that the cable outlet is in the right spot. If not, a new cable run will be necessary.
- Clear the space under the ceiling — the technician will need room for a ladder.
- If the chandelier has several lamp groups, say how you want them divided (2+3, 3+3, etc.).
- If the ceiling is stretch, mention it, a different mounting method is required.
A real case from Warsaw: light fitting installation

A client in Mokotow bought a large 8-arm chandelier weighing about 7 kg. The ceiling was concrete; the old hook was narrow and unsteady. Tradespeople took out the old hook and installed a heavy-duty anchor bolt on two fixings. Tradespeople connected the chandelier in two groups: 3+5 lamps on a double switch. Tradespeople checked both modes and tightened each connection. The chandelier is firmly in place, and the light works exactly as it should. The job took about 40 minutes.
Frequently asked questions
Can a chandelier be hung on a stretch ceiling?
Yes, but a mounting platform needs to be installed before the ceiling is stretched. If the ceiling is already in place, the technician will check whether such a platform is there.
How long does installation take?
A simple pendant — 20–30 minutes. A chandelier with several groups: up to 45 minutes. Several spots: it depends on the number.
What if there are only two wires but the fitting has three?
Two wires mean live and neutral; the earth is missing. The fitting will work, but there will be no earth protection. Adding earth means running an extra cable.
Can a heavy chandelier go on a plasterboard ceiling?
Only on a mounting platform fixed to the structural ceiling above. If you attach it straight to plasterboard, it will pull out.
Does the technician bring fixings?
Standard fixings (plugs, hooks) are usually included in the kit. Special brackets and platforms — best to confirm beforehand.
How much does it cost to hang a chandelier?
Between 80 and 150 zł per fitting. A standard chandelier on an existing ceiling hook sits at the bottom of that range. A heavy one on a mounting bar, a concrete ceiling, or a plasterboard suspended ceiling needs extra anchors and costs more. Hanging a chandelier over a table with height adjustment also lands at the upper end.
Do tradespeople work outside Warsaw?
Yes. Beyond Warsaw they cover Legionowo, Piaseczno, Marki, Ząbki, Pruszków and other towns around the capital. Travel outside the city is quoted separately and they tell you the amount when they agree the slot.
Can a tradesperson fit a light if there is no cable in the ceiling?
Yes, but that is no longer just mounting: it is creating an electrical point, 120–180 zł per point, plus chasing if the cable has to run under the plaster. Mention it when you book, because it changes both the scope and the time needed.
Book a light installation

Tradespeople install chandeliers, spotlights, wall lights, and LED panels across Warsaw. Safe mounting, proper wiring, every fitting checked after installation.
Order in the app
Describe the job, add photos and the address. Tradespeople send their own prices and dates, and you pick one of the offers.
Open the app